Build-Out Timeline

From HackPittsburgh Wiki
Revision as of 12:32, 11 February 2010 by Talldean (talk | contribs) (added content moved from the "space" page.)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Here is the tentative timeline for getting the space from nothing to something.

Past

Clean Up - March 21 (1pm-4:30pm)

Future

Wash-N-Scrape - March 29 (11am - ?pm)

Stuff to do:

  • Prep
    • Remove the remaining stuff in the space to outside (we hope)
    • Tarp over the dry wall & stuff we can't move easily
  • Pre-Wash
    • Pressure wash the walls and floors & sweep the muck into the drain
  • Scraping
    • Setup scaffolding & ladders
    • scrape walls and ceiling
  • Rinse
    • Pressure wash remaining debris
  • Stuff to bring:
    • Pressure Washers (looks like we have two of them)
    • Scrapers
    • Pry Bars
    • Claw Hammers
    • Misc. demo tools
    • Tarps
    • Brooms


Paint Party April 5th
  • Add your own content! Click the "edit" above!



Plans for the Space

Build Out Materials List

Equipment List

Here is the schematic. Note: the basement dividing wall isn't up yet - it's horizontal across the middle roof support (the little squares in the middle of the room).